Reno: Showing pit depth solid ore and surface covering same.
Caption: Ketona Oct. 3 1906 - After 3 Days PumpingThe digitization of this collection was funded by a gift from EBSCO Industries.
Main Author: | Tennessee Coal, Iron, and Railroad Company (Photographer) |
---|---|
Format: | Electronic |
Published: |
University of Alabama Libraries
|
Subjects: | |
Online Access: | http://purl.lib.ua.edu/148433 |
Similar Items
-
Reno: Showing stripping in pit.
by: Tennessee Coal, Iron, and Railroad Company (Photographer) -
No. 8, Ketona Quarry; showing outcrop with no stripping, from face of quarry as showing in photo No. 7; and the eight diamond drill holes; drill holes started in solid ledge with no surface and each drill hole 100' in depth.
by: Tennessee Coal, Iron, and Railroad Company (Photographer) -
Goethite: No. 2 Washer and Pit showing train cars which are loaded by wagon screened ore and loading into them.
by: Tennessee Coal, Iron, and Railroad Company (Photographer) -
Martaban: Showing one entire side of pit.
by: Tennessee Coal, Iron, and Railroad Company (Photographer) -
East Giles Pit: Showing nothing stripped.
by: Tennessee Coal, Iron, and Railroad Company (Photographer)