Nitrate Plant No. 2 Mess Hall

The Tennessee Valley is filled with minerals, including the materials needed to produce nitrates. Nitrates can be used for many things, most importantly for TVA to help add nutrients to fertilizer. This helped  to increase crop production. Another use for a nitrate plant can be for producing nitric...

Full description

Bibliographic Details
Main Author: Carrie Keener, University of North Alabama
Format: Electronic
Published: Auburn University Libraries
Subjects:
Online Access:https://omeka.lib.auburn.edu/items/show/1624
format Electronic
collection Alabama Cultural Resource Survey Collection
building Auburn University
publisher Auburn University Libraries
topic Cultural resources
spellingShingle Cultural resources
Nitrate Plant No. 2 Mess Hall
Carrie Keener, University of North Alabama
fulltopic Cultural resources
Mess Hall; Colbert County; Muscle Shoals; Nitrate Plant; TVA; Mess hall
description The Tennessee Valley is filled with minerals, including the materials needed to produce nitrates. Nitrates can be used for many things, most importantly for TVA to help add nutrients to fertilizer. This helped  to increase crop production. Another use for a nitrate plant can be for producing nitric acid during times of war to create explosives. These two important factors helped lead the US government to initially start building the Wilson Dam in 1918 and susbequently in 1933 give the TVA control of one of the two nitrate plants in the area of the Shoals. During the early twentieth century, only a small amount of nitrate used in the US came from the country. Most was imported from South America.<br /><br />The  top priority of the TVA was to improve soil and prevent erosion. By employing nitrogen from the plant, the TVA could improve farmland. Before the introduction of nitrogen back into the land by the TVA, farmers were exhausting the land and creating barren fallow fields of mud that eroded away into the river. With the plant came a village to house the many workers brought into the area by the Civilian Conservation Corps. This was called Village No. 2 and existed for 32 years. The plant was built by the American Cyanmid Company, with the overall goal of producing 40,000 tons of nitrogen. The plant and Wilson Dam, then referred to as Dam No. 2, were commissioned and built by the federal government, with the help of the state of Alabama. The plant was to produce ammonium nitrate by the cynamid process of nitrogen fixation. It cost about $12 million dollars to build. <br /><br />With the influx of workers, mainly from the CCC, mess halls were built in the villages to help feed all of the men. Village No. 2 housed one mess hall.
spelling Nitrate Plant No. 2 Mess HallCarrie Keener, University of North AlabamaMess Hall; Colbert County; Muscle Shoals; Nitrate Plant; TVA; Mess hallThe Tennessee Valley is filled with minerals, including the materials needed to produce nitrates. Nitrates can be used for many things, most importantly for TVA to help add nutrients to fertilizer. This helped  to increase crop production. Another use for a nitrate plant can be for producing nitric acid during times of war to create explosives. These two important factors helped lead the US government to initially start building the Wilson Dam in 1918 and susbequently in 1933 give the TVA control of one of the two nitrate plants in the area of the Shoals. During the early twentieth century, only a small amount of nitrate used in the US came from the country. Most was imported from South America.<br /><br />The  top priority of the TVA was to improve soil and prevent erosion. By employing nitrogen from the plant, the TVA could improve farmland. Before the introduction of nitrogen back into the land by the TVA, farmers were exhausting the land and creating barren fallow fields of mud that eroded away into the river. With the plant came a village to house the many workers brought into the area by the Civilian Conservation Corps. This was called Village No. 2 and existed for 32 years. The plant was built by the American Cyanmid Company, with the overall goal of producing 40,000 tons of nitrogen. The plant and Wilson Dam, then referred to as Dam No. 2, were commissioned and built by the federal government, with the help of the state of Alabama. The plant was to produce ammonium nitrate by the cynamid process of nitrogen fixation. It cost about $12 million dollars to build. <br /><br />With the influx of workers, mainly from the CCC, mess halls were built in the villages to help feed all of the men. Village No. 2 housed one mess hall.Alabama Cultural Resource SurveyDecember 1, 2015image, texthttps://omeka.lib.auburn.edu/items/show/1624FDR, TVA, And CCC Federal Influence In The Shoals: The Journal Of Muscle Shoals History Volume XIX'. 2015. Florence. William Lindsey McDonald Collection. UNA Special Archives. Gunther, John. 1953. 'The Story Of The TVA'. Book. Florence. William Lindsey McDonald Collection. UNA Special Archives. 'Sheffield History And Recollections: Journal Of Muscle Shoals History Volume XVIII'. 2011. Florence. William Lindsey McDonald Colleciton. UNA Special Archives. Carle, J.F. 'US Nitrate Plant No. 2, Muscle Shoals, Alabama'. Paper. Florence. William Lindsey McDonald Collection. UNA Special Archives. Young, Ronald. 1976. 'History Of US Facilities At Muscle Shoals, Alabama, And Origins Of The TVA'. Paper. Florence. William Lindsey McDonald Collection. UNA Special Archives.
title Nitrate Plant No. 2 Mess Hall
titleStr Nitrate Plant No. 2 Mess Hall
author Carrie Keener, University of North Alabama
author_facet Carrie Keener, University of North Alabama
id AUcultural1624
url https://omeka.lib.auburn.edu/items/show/1624
_version_ 1788802435237543936